Traffic Signal Design ProjectsProject Name & Location:Design of Intersection Improvements at Dairy Ashford Road and West Airport Boulevard, Sugar Land, Texas Client Name & Address:Public Works Department Services Rendered:Amani provided design for a second dedicated left turn lane to include approximately 250 feet of queuing area to inside existing left turn bay on southbound and northbound lanes of Dairy Ashford Road. Prepared Traffic Control Plan with multiple phases to construct turn lanes and median modification Project Name & Location:
Client Name & Address:HNTB Services Rendered:Amani provided Traffic Signal design for Chimney Rock at Willowbend intersection. Also provided temporary signal design during construction Project Name & Location:Study and Report Becker Road: south of Palo Dura to south of Union Pacific Client Name & Address:Harris County, Precinct 3 Services Rendered:Amani is the Prime consultant. Design services included feasibility study and report for roadway and drainage improvements for approximately 2000LF of roadway. Evaluated existing signals at the intersection of Becker rd. and US 290 and provided our recommendations for signal improvements in the Study and Report Project Name & Location:
Client Name & Address:WCW International Services Rendered:Amani provided design for complete reconstruction of Traffic Signal at York and Polk Street, and York and McKinney intersection. Also provided design for refurbishment/upgrade of existing traffic signals at York and Harrisberg, York and Canal and York and Navigational Boulevard intersections Project Name & Location:
Client Name & Address:Nathelyne A Kennedy & Associates Services Rendered:Amani provided Traffic Control Plan and design for temporary Traffic Signals for various construction phases Project Name & Location:
Client Name & Address:Sparks-Barlow-Barnett, Inc. Services Rendered:Amani Engineering was a sub-consultant to a pavement improvements project under the City of Houston Capital Improvements Program. The scope of signal design services included evaluation of existing five signals along Lockwood (at Weaver, Laura Koppe, Bennington, E. Crosstimbers, and Tidwell) and provides recommendations for improvements. Conditions existed at the time required complete reconstruction of five signals. The general scope of this project included evaluation and improvements to two lane asphalt pavement, approximately 7,500 feet in length, with roadside ditches, utilities, and five signals, within 80-foot wide ROW |


Chimney Rock Paving at Benning to Yarwell, Houston, Texas
York Street Reconstruction from Polk Street to Navigation Boulevard, Houston, Texas
Hillcroft Avenue reconstruction from Bellaire Boulevard to US 59, Houston, Texas
Reconstruction of Lockwood Drive from Bennington to Tidwell, Houston, Texas