Traffic Control Plan ProjectsProject Name & Location:
Client Name & Address:Public Works Department Services Rendered:Amani provided design for a second dedicated left turn lane to include approximately 250 feet of queuing area to inside existing left turn bay on southbound and northbound lanes of Dairy Ashford Road. Prepared Traffic Control Plan with multiple phases to construct turn lanes and median modification Project Name & Location:W. Little York Road, Storm Sewer System Improvements, Houston Client Name & Address:Lott and Brown Consulting Engineers Services Rendered:Amani prepared Traffic Control Plans for approximately 7500LF of W. Little York Road Project Name & Location:
Client Name & Address:Lockwood, Andrews and Newman, Inc. Services Rendered:Amani prepared Traffic Control Plan for Roadway and Drainage Improvements of Kirkwood Project Name & Location:
Client Name & Address:HNTB Services Rendered:Amani provided Traffic Control Plan and Construction Phasing plan Project Name & Location:30-inch water main along Lasso Lane, Autumn Oaks Lane and IH-10, Houston, Texas Client Name & Address:Kalluri Group Inc. Services Rendered:Amani prepared Topographic Survey. Plans, specifications and Cost Estimate, Traffic Control Plan (TCP), and the Storm Water Pollution Prevention Plan (SWPPP). 30” Water Main was approximately 3,400 feet in the accelerated Surface Water Transmission Program 43C Project Name & Location:Street Reconstruction from Polk Street to Navigation Boulevard, Houston Client Name & Address:WCW International Services Rendered:Amani provided Traffic Control Plan and Construction Phasing plan Project Name & Location:30-in. Water Main along Irvington and West Hardy between Berry E. Rittenhouse, Houston, Texas Client Name & Address:Scientech Engineers Services Rendered:Amani prepared Traffic Control Plan, specifications and cost estimate for the Water Main along Irvington and West Hardy between Berry E. Rittenhouse in the Accelerated Surface Water Transmission Program Project Name & Location:Water Main Constructions in Lakewood Heights Subdivision, Houston, Texas Client Name & Address:Kuo and Associates Services Rendered:Amani prepared Traffic Control Plan for Water Main Constructions in Lakewood Heights Subdivision Project Name & Location:Water line Replacement in Cliffwood Area, Houston, Texas Client Name & Address:Briones Consulting and Engineering, LTD. Services Rendered:Amani prepared Traffic Control Plan for approximately 17,000 LF of Water line Replacement Project Name & Location:Water Line Replacements in Holcombe Area GFS, Houston Client Name & Address:WCW International, Inc. Services Rendered:Amani prepare Traffic Control Plan (TCP) for approximately 30,000 feet of water line construction Project Name & Location:Water Line Replacement in Houston Heights Subdivision, Houston Client Name & Address:C/E Consultants Services Rendered:Amani provided traffic control design for waterline replacement, approximately 40,000 feet in Heights Subdivision Project Name & Location:Control Plan for Raven Forest Pipeline Project Client Name & Address:Holm, Bambace & McCabe, L.L.P Services Rendered:Amani prepared Traffic Control Plan for Raven Forest Pipeline project Project Name & Location:Water Main Replacement, Houston, Texas Client Name & Address:City of Houston Services Rendered:Amani provided Traffic Control Plans for 40,000 LF of distribution water lines 8" and 12" diameter in Campbell Woods / Long Point Acres Subdivisions including survey and design Project Name & Location:Water Main Replacement in Eastex Oaks III Subdivision, Houston, Texas Client Name & Address:Department of Public Works and Engineering, COH Services Rendered:Amani prepared Traffic Control Plan for the construction of the water main Project Name & Location:Granite Westchase 2 Construction at Beltway 8 and Richmond Avenue, Harris County, Texas Client Name & Address:Hoar Construction, LLC Services Rendered:As a sub-consultant, Amani provided Field Engineering and Layout Services including Traffic Control Plan for Lane Closure at Granite Westchase 2 Construction at Beltway 8 and Richmond Avenue |


Design of Intersection Improvements at Dairy Ashford Road and West Airport Boulevard, Sugar Land, Texas
Kirkwood Road Improvements, Bellaire to Alief Clodine, Houston, Texas
Chimney Rock Paving Project, Benning to Yarwell, Houston, Texas